Torrent details for "Principles of Railway Control and Communication IRSE Module C" Log in to bookmark
Controls:
×
Report Torrent
Please select a reason for reporting this torrent:
Your report will be reviewed by our moderation team.
×
Report Information
Loading report information...
This torrent has been reported 0 times.
Report Summary:
| User | Reason | Date |
|---|
Failed to load report information.
×
Success
Your report has been submitted successfully.
Checked by:
Category:
Language:
English
Total Size:
756.6 MB
Info Hash:
2874DEE86BEA6713D34871AB0B9AA314F2A21AED
Added By:
Added:
Feb. 21, 2025, 12:41 p.m.
Stats:
|
(Last updated: April 29, 2025, 12:41 a.m.)
| File | Size |
|---|---|
| Get Bonus Downloads Here.url | 180 bytes |
| 1 -Signalling Fundamentals.mp4 | 27.1 MB |
| 1 -Signalling Fundamentals.pdf | 502.1 KB |
| 1 -Signalling Fundamentals.pptx | 45.2 KB |
| 10 -Train Protection in Railway Signalling Systems.mp4 | 34.3 MB |
| 10 -Train Protection in Railway Signalling Systems.pdf | 282.9 KB |
| 10 -Train Protection in Railway Signalling Systems.pptx | 591.2 KB |
| 11 -Signal Positions in Railway Signaling.mp4 | 21.3 MB |
| 11 -Signal Positions in Railway Signaling.pdf | 370.6 KB |
| 11 -Signal Positions in Railway Signaling.pptx | 47.6 KB |
| 2 -Movement Authority.mp4 | 20.3 MB |
| 2 -Movement Authority.pdf | 493.5 KB |
| 2 -Movement Authority.pptx | 42.9 KB |
| 3 -The Block System.mp4 | 17.2 MB |
| 3 -The Block System.pdf | 489.4 KB |
| 3 -The Block System.pptx | 577.1 KB |
| 4 -Braking in Train Control and Signalling Systems.mp4 | 36.9 MB |
| 4 -Braking in Train Control and Signalling Systems.pdf | 568.7 KB |
| 4 -Braking in Train Control and Signalling Systems.pptx | 255.1 KB |
| 5 -Aspect Sequences and Overlaps in Railway Signalling.mp4 | 31.1 MB |
| 5 -Aspect Sequences and Overlaps in Railway Signalling.pdf | 361.3 KB |
| 5 -Aspect Sequences and Overlaps in Railway Signalling.pptx | 54.4 KB |
| 6 -Headway and Its Effects on Railway Operations.mp4 | 34.6 MB |
| 6 -Headway and Its Effects on Railway Operations.pdf | 279.3 KB |
| 6 -Headway and Its Effects on Railway Operations.pptx | 51.8 KB |
| 7 -Points and Junctions in Railway Systems.mp4 | 23.7 MB |
| 7 -Points and Junctions in Railway Systems.pdf | 275.1 KB |
| 7 -Points and Junctions in Railway Systems.pptx | 1.0 MB |
| 8 -Numbering of Signalling Assets.mp4 | 20.7 MB |
| 8 -Numbering of Signalling Assets.pdf | 521.4 KB |
| 8 -Numbering of Signalling Assets.pptx | 292.1 KB |
| 9 -Route Setting in Railway Signalling Systems.mp4 | 26.8 MB |
| 9 -Route Setting in Railway Signalling Systems.pdf | 378.3 KB |
| 9 -Route Setting in Railway Signalling Systems.pptx | 291.9 KB |
| 1 -Fundamentals of Train Control and Signalling Systems.mp4 | 29.0 MB |
| 1 -Fundamentals of Train Control and Signalling Systems.pdf | 499.0 KB |
| 1 -Fundamentals of Train Control and Signalling Systems.pptx | 41.7 KB |
| 2 -Types of Train Control Systems.mp4 | 15.8 MB |
| 2 -Types of Train Control Systems.pdf | 195.8 KB |
| 2 -Types of Train Control Systems.pptx | 45.2 KB |
| 3 -02_03_Route and Speed Signalling.pptx | 48.3 KB |
| 3 -Route and Speed Signaling.mp4 | 25.2 MB |
| 3 -Route and Speed Signaling.pdf | 202.4 KB |
| 4 -Braking Distance and Headway in Railway Systems.mp4 | 15.8 MB |
| 4 -Braking Distance and Headway in Railway Systems.pdf | 190.7 KB |
| 4 -Braking Distance and Headway in Railway Systems.pptx | 46.8 KB |
| 1 -Application Design in Railway Signalling.pdf | 363.6 KB |
| 1 -Application Design in Railway Signalling.pptx | 44.7 KB |
| 1 -Factors affecting application design.mp4 | 22.0 MB |
| 2 -Choice of Architecture and Equipment in Railway Signalling.mp4 | 16.9 MB |
| 2 -Choice of Architecture and Equipment in Railway Signalling.pdf | 361.2 KB |
| 2 -Choice of Architecture and Equipment in Railway Signalling.pptx | 44.0 KB |
| 3 -Application Design and Engineering Process.mp4 | 24.8 MB |
| 3 -Application Design and Engineering Process.pdf | 281.4 KB |
| 3 -Application Design and Engineering Process.pptx | 44.1 KB |
| 1 -Interaction with Other Disciplines in Railway Systems.mp4 | 33.7 MB |
| 1 -Interaction with Other Disciplines in Railway Systems.pdf | 278.7 KB |
| 1 -Interaction with Other Disciplines in Railway Systems.pptx | 48.9 KB |
| 2 -Interaction with Civils and Its Impact on Signal Positioning.mp4 | 25.8 MB |
| 2 -Interaction with Civils and Its Impact on Signal Positioning.pdf | 314.1 KB |
| 2 -Interaction with Civils and Its Impact on Signal Positioning.pptx | 43.5 KB |
| 3 -Impact of Electrification Design on Signaling Principles.mp4 | 21.9 MB |
| 3 -Impact of Electrification Design on Signaling Principles.pdf | 187.9 KB |
| 3 -Impact of Electrification Design on Signaling Principles.pptx | 42.7 KB |
| 4 -Telecommunications and Signaling Systems Integration and Impact.mp4 | 26.6 MB |
| 4 -Telecommunications and Signaling Systems Integration and Impact.pdf | 273.7 KB |
| 4 -Telecommunications and Signaling Systems Integration and Impact.pptx | 46.6 KB |
| 5 -Operators, Maintainers, and Drivers in Railway Signaling Systems.mp4 | 23.0 MB |
| 5 -Operators, Maintainers, and Drivers in Railway Signaling Systems.pdf | 261.1 KB |
| 5 -Operators, Maintainers, and Drivers in Railway Signaling Systems.pptx | 45.1 KB |
| 1 -Installation, Testing, and Commissioning in Railway Signaling Systems.mp4 | 21.4 MB |
| 1 -Installation, Testing, and Commissioning in Railway Signaling Systems.pdf | 264.5 KB |
| 1 -Installation, Testing, and Commissioning in Railway Signaling Systems.pptx | 46.5 KB |
| 2 -Testing in Railway Signaling Systems.mp4 | 25.3 MB |
| 2 -Testing in Railway Signaling Systems.pdf | 443.9 KB |
| 2 -Testing in Railway Signaling Systems.pptx | 44.9 KB |
| 3 -Commissioning.mp4 | 23.6 MB |
| 3 -Commissioning.pdf | 274.4 KB |
| 3 -Commissioning.pptx | 45.0 KB |
| 1 -Railway Operations – Signalling for Normal and Abnormal Conditions.mp4 | 23.7 MB |
| 1 -Railway Operations – Signalling for Normal and Abnormal Conditions.pdf | 319.8 KB |
| 1 -Railway Operations – Signalling for Normal and Abnormal Conditions.pptx | 44.9 KB |
| 2 -Railway Operations - Degraded Modes & System Interfaces.mp4 | 31.7 MB |
| 2 -Railway Operations - Degraded Modes & System Interfaces.pdf | 322.6 KB |
| 2 -Railway Operations - Degraded Modes & System Interfaces.pptx | 45.1 KB |
| 3 -Maintenance in Signalling Systems.mp4 | 28.9 MB |
| 3 -Maintenance in Signalling Systems.pdf | 277.2 KB |
| 3 -Maintenance in Signalling Systems.pptx | 50.6 KB |
| 1 -Interlocking Control Tables.mp4 | 13.6 MB |
| 1 -Interlocking Control Tables.pdf | 362.9 KB |
| Bonus Resources.txt | 70 bytes |
Name
DL
Uploader
Size
S/L
Added
-
756.6 MB
[5
/
3]
2025-02-21
| Uploaded by freecoursewb | Size 756.6 MB | Health [ 5 /3 ] | Added 2025-02-21 |
NOTE
SOURCE: Principles of Railway Control and Communication IRSE Module C
-----------------------------------------------------------------------------------
COVER

-----------------------------------------------------------------------------------
MEDIAINFO
None
×


